September Septic

Tuesday preparations were made for the septic tank.Watch out, Jason! (The backhoe was actually not moving in this picture.)Marking where the hole would be.
Daisy's job was to guard the water hose and hold on to the spray paint lid.
She took her job very seriously.
Moving the picnic table out of the way.
The digging went on into the night.
Jason hung out in the hole and measured since it had to be specific dimensions.
Daisy kept a close watch on the situation.
Raking sand to help level it.Getting it just right.
And in case you were wondering what the Welding Wife accomplished besides taking about 100 pictures of Daisy sitting in the water hose (yes, I realize some of the weirdest things amuse me and you can thank me for only posting two since there were a lot of cute ones), I started taping the kitchen cabinets for staining.

Comments

Popular Posts